BOS-PRD-07.900503
Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.
Procedure prepared by: BOS Head of Operations. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.
6 / 13
x
Any special characteristics of the cargo (especially if hazardous), and its distribution, stowage and
securing on board the vessel;
x
The provision of a competent and well-rested crew to undertake the passage;
x
Requirements for up-to-date certificates and documents concerning the vessel, its equipment, crew,
passengers or cargo;
x
Appropriate scale, accurate and up-to-date charts to be used for the intended passage, as well as
any relevant permanent or temporary notices to mariners and existing radio navigational warnings;
x
Accurate and up-to-date sailing directions, lists of lights and lists of radio aids to navigation;
x
Mariners' routeing guides and passage planning charts, published by competent authorities;
x
Current and tidal atlases and tide tables;
x
Climatological, hydrographical, and oceanographic data as well as other appropriate meteorological
information;
x
Availability of services for weather routeing;
x
Existing ships' routeing and reporting systems, vessel traffic services, and marine environmental
protection measures;
x
Volume of traffic likely to be encountered throughout the passage;
x
If a
P
ilo
t
is to be used, information relating to pilotage and embarkation and disembarkation
including the exchange of information between
Mas
t
er
and
P
ilo
t
;
x
Available port information, including information pertaining to the availability of shore-based
emergency response arrangements and equipment;
x
Any additional items pertinent to the type of the vessel or its cargo, the particular areas the vessel
shall
traverse, and the type of voyage or passage to be undertaken;
x
Security information
should
be present in passage planning.
4
.1.
2
P
re
p
arin
g
t
h
e
P
assa
g
e
P
lan
The detailed Passage Plan
shall
include the following factors:
x
The plotting of the intended route or course of the passage on appropriate scale charts: the true
direction of the planned route or course
shall
be indicated, as well as all areas of danger, existing
ships' routeing and reporting systems, vessel traffic services, and any areas where marine
environmental protection considerations apply;
x
Exact Offshore Installation positions
SHALL NOT
be used for GPS waypoints: always use an offset
position, preferably on the down-current side, of at least one nautical mile from the installation.
The main elements to ensure safety of life at sea, safety and efficiency of navigation, and protection of the
marine environment during the intended passage; such elements
shall
include, but not be limited to the
following:
x
Safe speed, having regard to the proximity of navigational hazards along the intended route or track,
the manoeuvring characteristics of the vessel and its draught in relation to the available water depth;
x
Necessary speed alterations on passage; where there may be limitations because of night passage,
tidal restrictions, or allowance for the increase of draught due to squat and heel effect when turning;
x
Minimum clearance required under the keel in critical areas with restricted water depth;
x
Positions where a change in machinery status is required;
x
Course alteration points, taking into account the vessel's turning circle at the planned speed and any
expected effect of tidal streams and currents;
x
The method and frequency of position fixing, including primary and secondary options and the
indication of areas where accuracy of position fixing is critical and where maximum reliability
shall
be
obtained;
x
Use of ships' routeing and reporting systems and vessel traffic services;
x
Considerations relating to the protection of the marine environment;
x
Contingency plans for alternative action to place the vessel in deep water or proceed to a port of
refuge or safe anchorage in the event of any emergency necessitating abandonment of the plan,
taking into account existing shore-based emergency response arrangements and equipment and the
nature of the cargo and of the emergency itself;
x
The details of the voyage or Passage Plan
should
be clearly marked and recorded, as appropriate,
on charts and in a Passage Plan or computer disk;
x
Security information
shall
be present in passage planning.