Table of Contents Table of Contents
Previous Page  234-Passage Planning and Manoeuvring / 748 Next Page
Information
Show Menu
Previous Page 234-Passage Planning and Manoeuvring / 748 Next Page
Page Background

P

assa

g

e

P

lannin

g

and Manoeu

v

rin

g

BOS-PRD-07.900503

Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Head of Operations. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

8 / 13

4

.

2

.1

P

or

t

in

f

or

m

a

t

ion

The Port Authority

shall

be notified according to any Standing Port Regulations.

The following information requirements

shall

be established:

x

Port information;

x

Sailing directions;

x

Communication requirements;

x

Weather reports;

x

Tidal information;

x

Depth of water in approaches, channels and at the assigned berth;

x

Any restrictions on draft, trim, speed or entry times;

x

The documents required for inward clearance; these

shall

be completed in good time.

4

.

2

.

2

D

ra

f

t,

t

ri

m

and s

t

a

b

ili

t

y

Using the loading calculator, the

Mas

t

er

shall

ensure that the loaded or ballast condition of the vessel is in

compliance with the vessels

Stability Booklet

and that load line requirements have been complied with.

The

Mas

t

er

shall

ensure that the routine checks required by the Classification Society to verify the software

of the loading calculator have been completed and recorded.

4

.

2

.

3

U

nder keel

c

learan

c

e

The Company has defined

Shall

ow water as 2 m Under Keel Clearance and this

should

be considered as the

MINIMUM water depth for normal operations.

Depending on the operations in question, it may be sometimes required to traverse a channel or operational

area where the water depth is LESS than the minimum stated 2 m requirement.

In such circumstances a FULL appraisal and Risk Assessment

shall

be performed and documented with

permissions obtained from Shore base Operational management prior to performing any operations.

Considerations as to risk factors

shall

include as a minimum the requirements indicated above (see chapter

4.2.1.

“

Port information”

).

4

.

2

.

4

NO-GO A

rea

Coastal and estuarial charts

should

be examined, and all areas where the ship CANNOT go must be

carefully shown by highlighting or cross hatching, care being taken to not obliterate information such as a

navigation mark or a conspicuous object. Areas so marked are to be considered as no-go areas. In waters

where the tidal range may not be very large, no-go areas

shall

include all charted depths of less than the

ship’s draught plus a safety mar

gin. Such areas

shall

vary according to the ship’s draught

and so will not be

necessarily the same for both inward and outward passages. In general the line determining the “no

-

go” will

be not less than draught + 10%, though this will need to be modified according to the prevailing

circumstances. Draught + 10% may be sufficient in areas where the sea is smooth but will require a higher

figure if the ship is liable to pitch, roll or squat.

In confined area waters, where the tidal height may have a large influence, such no-go areas

shall

vary

according the last time of passage. Initially all areas and dangers showing charted depths of less than the

draught plus the safety margin

should

be considered no-go, though such may be subsequently amended

when the actual time of passage is known. Such areas will need to be carefully marked showing the times

and state of tide at which they are safe.