Table of Contents Table of Contents
Previous Page   687/ Incident Reporting, Investigation and Management / 992 Next Page
Information
Show Menu
Previous Page 687/ Incident Reporting, Investigation and Management / 992 Next Page
Page Background

I

nc

i

den

t

Rep

orti

ng,

I

nves

ti

ga

tio

n

and Managemen

t

BOS-PRD-0302.900801

The experience levels of assigned investigator(s)

shall

be related to the depth or seriousness of the incident

investigation requirements.

Personnel involved in the incident investigation

shall

be aware of their individual responsibilities, including

legal responsibilities.

4

.

9

.

2

I

nves

ti

ga

tio

n P

ro

cess

Ki

ck

-o

ff mee

ti

ng

Within 48 h after event, a kick-off meeting

shall

be carried out with the following participants prior to start any

investigation :

x

Operation

M

anager;

x

QHSE Coordinator;

x

Technical Superintendent (if technical issues or engine staff involved);

x

Head of Operations (upon severity/potentiality of the case);

x

QHSE

M

anager (upon severity/potentiality of the case);

x

Technical

M

anager (upon severity/potentiality of the case);

x

Crewing

M

anager or deputy (upon severity/potentiality of the case).

The meeting

shall

:

x

Clarify the case;

x

Determine the composition of the investigation team;

x

Determine the list of evidences to collect and dispatch the roles within the team;

x

Schedule a date for final investigation review.

In case of a Lost Time Injury (LTI) occurring, The kick-off meeting

shall

include following participants:

x

HSE Director;

x

Ship

M

anagement Organization

M

anaging Director;

x

Contracting Organization

M

anaging Director;

x

V

ice President Fleet

M

anagement;

x

V

ice President Operational Safety

M

anagement (OS

M

).

R

oot

cause

ana

l

ys

i

s

An HSE event is composed of three key factors that

shall

be clearly identified:

x

The direct cause(s): Has immediately generated the event. For example, an oil leak on deck is the

direct cause of the fall of the injured person;

x

The contributing factor(s): One or several factors that has contributed to the event. Following the

previous example, the leaking pipe which has generated the leak is the contributing cause;

x

The root cause(s): Origin of the event, the failure(s) in the system. From the previous example, it

could be an issue linked to the maintenance system that does not take into account the regular

piping verification.

The preferred root cause analysis tool for incident investigation is TapRooT

®

. TapRooT

®

software

should

be

used for all high potential impact incidents. The

5

Whys methodology

should

be used in addition to

TapRooT

®

in the following cases:

x

Real severity greater or equal to 2;

x

Potential severity greater or equal to 4.

V

ersion 06. Original date: 0

5

/06/2012.

V

ersion date: 31/12/201

5

.

V

alid version only on Q

M

S site.Uncontrolled document when printed.

Procedure prepared by: BOS QHSE

M

anager. Approved by: BOS QHSE

M

anager.

V

alidated by: BOS Quality Representative.

Page 21 of 26

687