BOS-PRD-03.900901

4.

9 C

ontin

u

o

u

s Safet

y

A

w

a

r

eness

After completing any JSA and TBT, Continuous Safety Awareness (CSA)

shall

be conducted during the

excution of the job to further ensure that the task can be completed safely.

The CSA methodology (the

4C

s)

shall

be implemented:

x

C

onsi

d

e

r

What can happen during the task and what are the risks?

x

C

omm

u

ni

c

ate

Talk to your team and supervisors, and ensure that everyone involved remains fully

aware of the risks and continues to consider all mitigating measures.

x

C

ont

r

ol

Ensure that all measures necessary to eliminate or mitigate the risks are

implemented and remain in place.

x

C

omplete

Finish the task safely.

Each individual has the authority and responsibility to “

Stop Wo

r

k

” if anything is considered unsafe to

personnel, assets or the environment.

4.1

0 J

S

A

r

evie

w

p

r

o

c

ess

Once the job is completed, the post job review section

shall

be completed and if applicable,

an

y

thing

i

d

entifie

d

that

w

o

u

l

d

imp

r

ove safet

y

o

r

effi

c

ien

cy

of the same job in the future

shall

be

d

o

cu

mente

d

in

the

TBT Logbook

.

Once the job is completed, the S-JSA

shall

be reviewed by the person responsible for supervising the job. If

any additions or amendment have been made other than those to make a G-JSA specific to a particular job

in the

TBT logbook

, a copy of the S-JSA may be returned to the

Ope

r

ations Manage

r

and

Q

HSES

C

oo

rd

inato

r

for review.

If the

Maste

r

judges that the JSA can be applied to other vessels, he can share it by sending it to the

QHSES Coordinator and Operations Manager.

Once per year, S-JSAs will be reviewed in order to update if needed and verify if there is a need for the

creation of a G-JSA and to update accordingly the MSD/DUP. (see Chap. 2).

Version 04. Original date: 25/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Senior QHSE Coordinator. Approved by: BOS QHSES Manager. Validated by: BOS Quality Representative