DP Op

erations

P

rocedure

BOS-PRD-0701.900606

b) Notifying well in advance the

Op

erations Manager

when customer’s expectations exceed Bourbon

Offshore DP Guidelines

and

DP Operations Best Practices

.

4 D

escri

p

tion

G

eneral

x

All personnel involved in DP operations

shall

take knowledge of this DP procedure.

x

DP personnel

shall

refer to

Bourbon DP Operations Best Practices

for generic part and, to

“

Guidance on vessel specific part

” for vessel specifications. This latter

shall

be available at the

Bridge and Engine Control Room.

x

DP personnel

shall

fill up relevant acknowledgement forms at Bridge for DPOs and Engine Control

Room for engineers after having conducted a DP familiarization.

4

.1

DP Op

erations Manual on

b

oard

4

.1.1

S

tructure

x

All BOS DP vessels

shall

implement this DP procedure on board.

x

As per BOS SMS vessel filling system, binder 113 contains DP Procedure. Nevertheless, to be easy

to read and to use, BOS Head Office Management decided to divide binder 113 in 3 parts at the

Bridge and, set up an additional binder at the Engine Control Room (binder 306).

x

Structure of Binder 113 DP Manual, as following:

˜

113A - DP Manual;

˜

113B - DP Manual records;

˜

113C - DP trials records.

x

Refer to

BOS-DRT-11.0003-Vessel Filing System

for detailed structure of binder 113A-113B-113C

and 306.

Version 03. Original date: 13/02/2014. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Project Coordinator. Approved by: BOS Senior of Operations Director. Validated by: BOS Quality Representative.