Table of Contents Table of Contents
Previous Page  352-Lifting and Hoisting Operations / 748 Next Page
Information
Show Menu
Previous Page 352-Lifting and Hoisting Operations / 748 Next Page
Page Background

L

iftin

g

and

H

oistin

g Op

erations

BOS-PRD-07.900604

x

Copies of certificates of the cargo gear and copies of the Cargo Gear Maintenance Record

shall

be

sent to the Management office;

x

Copies of lifting equipment

shall

be sent to the

L

iftin

g

En

g

ineer Mana

g

er

.

4

.

5

.1

R

e

j

e

c

ted liftin

g

m

aterial

When material has been rejected it

shall

be well marked and guarded to ensure it is not put in use.

Rejected material

shall

be discarded as soon as practically possible.

Version 04. Original date: 28/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

18 / 20

352