BOS-PRD-07.900602

When determining the type and extent of restraining arrangements required the

Master

shall

consider the

following factors:

x

The motion characteristics of the vessel;

x

The anticipated weather conditions;

x

The freeboard;

x

The nature of the cargo;

x

The number of installations to be worked.

4.

6 U

se o

f

ta

g

lines

Tag lines are particularly useful with alignment of cargo on fixed platforms and with flat bed motor vehicles

(trucks) however they can introduce additional hazards and risks on the deck of a moving supply vessel

where work areas and escape routes are often severely limited or restricted.

Some clients have a requirement for compulsory tag line use on all crane lifts and efforts

shall

be made to

comply with clients requirements, including appropriate risk assessment to adequately manage the

requirement. However, this requirement does not necessitate approaching suspended loads or making

attempts to hold or secure tag lines in efforts to assist crane operators positioning cargo.

Risk is manageable by elimination of hazards and remaining clear of a swinging load until it has been

landed; compliance with the Clear Deck Policy is a safe approach that

shall

ensure risk is maintained to an

absolute minimum.

Special provision is made for giving assistance with personnel transfers (Billy Pugh/Frog) whereby crew are

permitted to assist in the safe operation of the transfer by handling the attached tag line.

More specific details can be found in the

Guidelines for the Safe Packing and Handling of Cargo to and from

Offshore Locations

, Appendix 11 – UKOOA.

4.

7

Clear

D

e

c

k

P

oli

c

y

BOURBON has adopted a Clear Deck Policy for all crews working with suspended loads on all Affiliate

Company owned and operated vessels as below;

All personnel

shall

remain within designated safe areas until suspended loads have been finally positioned

and landed by crane operators and pendant or stinger lines are slack and free from tension or crane

operated movement; this requirement applies to port and similar location operations.

4.

8 D

e

p

art

u

re an

d

arrival

c

h

e

c

k

s

The following arrival and departure checks

shall

be made:

x

All lifting material is certified as per lifting equipment procedures;

x

Cargo lifting arrangements (slings, shackles etc) are identified by the colour code in operation and

their good condition visually confirmed;

x

Cargo carrying units (containers, baskets, skids, boxes etc) are confirmed as being in good condition

and are suitable for purpose;

x

All slings on any bundled cargo items (drill pipe etc) are tight and sufficient;

x

Each cargo item has been be visually checked to ensure that no loose items such as tools, shackles,

debris could fall and cause injury;

x

Any container or basket doors and other openings are properly fastened and secure;

x

Any items loaded on skids, inside open top cargo carrying units or any other carrying unit with

access is properly and adequately secured;

x

The electrical connections on any refrigerated containers are compatible with the vessel’s deck

connections and that the unit’s compressors operate properly after being connected. Report any

malfunction to the

Contra

c

ts Mana

g

er

or the installation responsible person if back loaded offshore;

x

Ensure that all cargo units are ready to be hooked up for lifting;

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Operations Manager Director. Validated by: BOS Quality Representative