Table of Contents Table of Contents
Previous Page  296-Cargo Operations / 748 Next Page
Information
Show Menu
Previous Page 296-Cargo Operations / 748 Next Page
Page Background

Car

g

o

Op

erations

BOS-PRD-07.900602

4 D

escri

p

tion

4

.1 Car

g

o

p

lannin

g

Cargo Plans

shall

be prepared prior to loading of vessels, with particular attention to the following:

x

Deck loading;

x

Vessel stability;

x

The intended voyage (discharge sequence);

x

Personnel safety.

4

.

2

Car

g

o

Op

eration

M

onitorin

g

Monitoring

should

include confirmation that the vessel complies with requirements of the procedure, such as

port restrictions and shipboard limits including stress and stability and maximum loading capacities.

4

.

3

Car

g

o

p

lannin

g p

rior to loa

d

in

g

in

p

ort

In making the Cargo Plan, the following considerations (as a minimum)

shall

apply:

x

The type and amount of cargo, giving specifics such as pipes, heavy lifts, containers, baskets and

dry bulk;

x

Stability and trim considerations, ensuring that the vessel’s stability stays within the permitted limit

(stability and trim must be monitored during loading/discharging and sailing);

x

The identification and order of installations to visit, including any priorities;

x

Any possible restrictions at installations (crane reach, installation orientation);

x

The expected weather conditions that may be encountered;

x

The cargo positioning, loading and offloading sequence

shall

be agreed to be in compliance with

the installation routing order.

When practical, the best practice is to load and stow large and heavy items against the vessel crash

rails/cargo rails and smaller, lighter items inboard of them and towards the centre of the deck, which

shall

ensure that the large and heavy lifts can be adequately secured against the crash/cargo rails whilst giving

protection to the smaller lighter items.

Provision

shall

be made to ensure that electrical connections on refrigerated containers to be protected from

positions of anticipated sea spray and sea wash; whenever possible.

Any dangerous goods/hazardous materials/marine pollutants

shall

be declared, clearly identified, properly

packaged and labelled (in compliance with the

IMDG code

) and arrangements made for their safe

segregation as per the company SMS and vessel’s requirements.

Applicable

Material Safety Data Sheets

(MSDS)/

Product Data Sheets

and any other required documentation

for hazardous material

shall

be provided.

The allowance of any required space for back-load and/or passenger transfer is arranged (as applicable).

Safe accesses to the cargo, to shelter and to safe areas on deck are preserved for crew when at sea.

Any bulk tanks are clean and approved for the intended product. The charterer’s representative

shall

confirm

that the tanks are clean, give approval to load and verify this by signing a Bridge Logbook Entry.

If any tanks were previously used for a different bulk cargo, the charterer’s representative

shall

approve

“loading on top” and verify this by signing a Bridge Logbook Entry.

Loading of hydrocarbon products

shall

carried out as per the standard bunkering operational procedures

(See

Bunkering Operations

, SMS Section 6).

Version 04. Original date: 22/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Operations Department Project Manager. Approved by: BOS Operations Manager Director. Validated by: BOS Quality Representative

5 / 17

296