BOS-PRD-2602.900401

As few examples:

o

ENGINE/PREVENTIVE/DG#2 – 15 000 hrs overhaul.

Spares requisition created by Engine Department, for preventive overhaul necessary spares

for DG#2 at 15,000 running hours.

o

DECK/STORES/Consumables 01-2013.

Stores requisition, created by Deck Department, for January 2013 consumables quarterly

needs.

o

ENGINE/DEFECT/DG#2 – Service Engineer for turbo replacement

Service Engineer requisition, created by Engine Department, following a defect on DG#2

requiring turbo charger replacement.

x

Expected vessel location at the time of delivery required date.

x

Not in use within Bourbon Offshore Surf Organization.

x

Delivery required date for all requisition items. This date

shall

take into account the vessel country of

operation shipment particulars and be consistent with the priority filled in the ‘Priority for all’ field.

x

Three sets of priority are defined:

o

TOP URGENT (correspond to ‘Highest’ in the scrolling list).

The vessel will be or is already stopped or detained if these parts are not on board; or they can seriously

affect safety matters, lives or operational status of vessel; their lack may lead to damage to Company’s

image or penalties. The parts and/or service are to be purchased immediately and be shipped by the fastest

means available, including hand carrying. This

should

not apply to stores/consumables.

T

e

c

h

nical Su

pe

rin

te

n

de

n

t

,

O

pe

ra

t

i

o

n Mana

ge

r

and

P

urc

h

asin

g

O

ff

ic

e

r

must be advised also by the

appropriate communication means.

o

URGENT: (correspond to ‘High’ in the scrolling list).

The parts and/or service require to be purchased immediately and be shipped by airfreight taking in

consideration the best price and flight availability, delay to be counted in days. This priority indicates that the

parts

shall

reach the vessel in less than 30 days. The parts do not affect the seaworthiness of the vessel and

its fundamental operational status – there is some redundancy.

o

ROUTINE (correspond to ‘normal, low or lowest’ in the scrolling list).

This priority indicates that parts, stores, consumables or service

shall

be delivered within the next 3 months

to 6 months.

All stores and consumables priority

shall

be set as “routine”.

x

Select the suitable code in the scrolling list.

Version 01. Original date: 31/12/2014. Version date: N/A. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS Supply Chain Manager. Approved by: BOS QHSES Manager. Validated by: BOS Quality Representative