P
lanned Maintenance
P
eriod
Mana
g
e
m
ent
P
rocedure
BOS-PRD-2601.900402
Version CR(BOS-PRD-10.900402) . Original date: 28/05/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.
Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.
3 / 18
1
P
ur
p
ose
The purpose of this procedure is to describe the Planned Maintenance Period (PMP) management process.
Planned Maintenance Period is to be understood as a period during which the vessel is immobilized to
perform scheduled and corrective maintenance, in accordance with Class Society requirements and
maintenance plan included in Computerised Maintenance Management System (CMMS). This period is
scheduled on Class Society bottom survey due period (annual for High Speed Crafts registered vessels and
at intermediate or renewal survey for other vessels), usually requiring the vessel to be docked within this time
frame. Classification Surveys intervals overview is detailed in § 4.6.1.
2
Sco
p
e
This procedure addresses the following stages of the Planned Maintenance Period:
x
Preparation;
x
Worksite follow up and achievement;
x
Reporting upon completion;
This procedure applies to:
x
Vessels technically managed by Bourbon Offshore Surf (BOS), i.e. vessels for which BOS technical
department is responsible for routine maintenance in operation as well as Planned Maintenance
Period;
x
Planned Maintenance Period assumed by BOS Technical Department or delegated to Bourbon
Docking entity (BDO);
166