10) Helicopter returns to a position vertically over the hoist area and retrieves the tag-line manually.

During retrieval, Person tasked with tending the stretcher will guides the tag-line off the deck and

then leave the hoisting zone.

11)

Ch

ie

f Off

icer

signals the helicopter to withdraw and stretcher evacuation is completed.

4

.1.

6 P

roce

du

re

f

or

h

oistin

g p

a

y

loa

d

s

4.1.6.1 Preparation

Insofar as possible, the vessel

should

inform the helicopter crew of the total weight to be transferred

(stretcher and casualty).

When transferring to the vessel, it is important to remember that sling carries a 10 kg weight and a hooking

device allowing attachment and detachment of the payload.

Payloads may be transferred using palettes, nets (e.g. for bulk materials), or slinging devices with several

cables for large oversize loads.

When packing nets, special care

should

be taken to avoid shifting when the load is landed.

4.1.6.2 Attaching the payload

Before arrival of the helicopter, the stretcher

should

be prepared and moved to the hoisting zone.

The

AB

should

stand by near the hoisting zone, ready for the

Ch

ie

f Off

icer’s

instructions.

After stabilizing the sling above the payload and with the Authorization by

Ch

ie

f

Off

icer

, the load can be

attached as follows:

1) Deck team takes position beneath the helicopter.

2) Bosun grounds the hook by touching with the static discharge rod that has been clamped to the

vessel.

3) Bosun tasked with grounding puts the static discharge rod down and holds it on the deck with one

foot then picks the sling up so that the cables are straight. When standing on the cable, the bosun

must stay alert of the helicopter’s movement.

4) Bosun in charge of attaching the payload places the hook in the ring holding the stretcher.

When the hook has been firmly attached and can be clearly seen by the

Ch

ie

f Off

icer

, the

b

os

u

n

gives the

regulatory “OK” hand signal to the helicopter crew and the

Ch

ie

f Off

icer

. At the same time the deck team

withdraws without further instructions.

Hoisting

should

not begin until personnel have withdrawn from the hoisting zone and the helicopter is

positioned vertically over the payload.

4.1.6.3 Detaching the payload

When the vessel is ready, the helicopter approaches under guidance by the

Ch

ie

f Off

icer

.

1) After the payload has been landed, the helicopter has stabilized, and the pilot has given “OK” hand

signal, the

Ch

ie

f Off

icer

will instruct the deck team to take position under the helicopter.

2)

Bos

u

n

grounds hook by touching with the static discharge rod.

3)

Bos

u

n

tasked with grounding puts the static discharge rod down and holds it on the deck with one

foot then picks the sling up so that the cables are straight. When standing on the cable, the

b

os

u

n

must stay alert of the helicopter’s movement.

4)

Bos

u

n

tasked with tending the hook detaches the payload.

5) The

Ch

ie

f Off

icer

gives the regulatory “OK” hand signal to the helicopter crew as well as the deck

team. At the same time the deck team withdraws without further instructions.

If the helicopter pilot decides to release the sling, he will first inform the

Ch

ie

f

Off

icer

who will

prevent the deck team from taking position in the hoisting zone.

4.1.6.4 Safety instructions

The hazards associated with rotor downwash and vessel movement (falling), static electricity discharge

(electrical shock), and swinging or sudden disconnection of the payload (falling objects) can be minimized by

strict application of procedures.

Version 01. Original date: 08/08/2014. Version date: N/A. Valid version only on QMS site. Uncontrolled document when printed

Procedure prepared by: BOS Ops Dpt Project Coordinator. Approved by: BOS Operations Department Director. Validated by: BOS Quality Representative.