Table of Contents Table of Contents
Previous Page  254-Navigation Standards and Equipment / 748 Next Page
Information
Show Menu
Previous Page 254-Navigation Standards and Equipment / 748 Next Page
Page Background

N

a

v

i

g

ation Standards and

Eq

ui

pm

ent

BOS-PRD-07.900505

Version 04. Original date: 01/06/2012. Version date: 31/12/2014. Valid version only on QMS site. Uncontrolled document when printed.

Procedure prepared by: BOS OPS Dpt Project Manager. Approved by: BOS Head of Operations. Validated by: BOS Quality Representative.

3 / 11

1

Purpose

The Company gives the highest priority to safe navigation practices and standards through the provision of

regularly updated and robust instructions, procedures and guidance: ensuring that the latest legislation and

best industry practices are implemented as early as is practicable.

Audits, inspections and monitoring are performed to confirm compliance and identify areas where

improvement is needed; corrective action is swiftly taken and verified.

In compliance with the

ISM Code

, requirements of

OSM Guidelines

and industry best practices referenced in

this document, this procedure has been developed and

shall

be used in association with in relation to

management of risk.

2

Scope

This procedure has been established to ensure that:

x

Reliance is not placed on single position fixing systems or techniques;

x

Instructions for effective passage planning for all stages of the voyage, including information

exchange with pilots and offshore installations, as applicable;

x

Instructions for navigation in the proximity of offshore installations that include entry procedures for

established safety zones;

x

All

De

c

k O

ff

i

c

ers

receive appropriate training in ship handling and vessel-specific familiarisation,

addressing maneuvering characteristics and operational control modes;

x

Up-to-date copies of nautical publications, including revisions, amendments and chart corrections,

are consistently available;

x

The performance of bridge equipment is monitored consistently, and defect and reliability reporting

measures are in place;

x

The performance and effectiveness of bridge management teams are monitored so that any

additional training needs (particularly those of

Junior O

ff

i

c

ers

) are identified, and arrangements are

made to provide the required training.

254