R
eliabilit
y
and Maintenance
P
rocedure
BOS-PRD-2601.900401
Records of each technical inspection
shall
be maintained on permanent file within the Technical Department
and onboard each vessel as applicable.
The inspection
shall
include critical equipment.
Inspection scheduling and monitoring
should
be measured and managed under the
Technical Manager’
s
KPI’s which
shall
be incorporated into the technical reporting required for the Quarterly Management Review
meeting.
The standard form
BOS-FRM-10.0001 – Vessel Technical Survey Report
is used for this purpose. This form
include instructions for the management of the recommendations noted in the report.
Upon reception of the validated report,
Ma
s
ter
and
C
hie
f
Engineer
shall
record recommendation in Task
Assistant
TM
or Operation Action Plan (for vessels not fitted withTask Assistant
TM
software), take all necessary
actions and update records upon actions completion.
4.1
6
In
sp
ection o
f
cargo tan
ks,
balla
s
t tan
ks
and void
sp
ace
s
The vessel inspection program
shall
include routine inspection of vessels hull integrity including inspection of
integral tanks and void spaces.
Where possible this inspection routine
should
be incorporated into the vessel CMMS and managed as part of
the Preventive Maintenance program.
Records of SPECIFIC tank inspections
shall
be maintained in a standard format (in CMMS) , and
shall
include use of photographs’ as evidence to the specific tank’s condition.
Version CR(BOS-PRD-10.900401). Original date: 28/05/2012. Version date: 31/12/2014.Valid version only on QMS site. Uncontrolled document when printed
Procedure prepared by: BOS Technical Manager. Approved by: BOS Technical Manager. Validated by: BOS Quality Representative.
14 / 21
156




